Around the World in Eighty Days as a project: Kanban board and Gantt chart
Phileas Fogg bets twenty thousand pounds that he can go round the world in eighty days, leaving London on the evening of 2 October 1872 and due back at the Reform Club by 8.45 pm on 21 December. The team is Fogg and his new servant Passepartout, later joined by Aouda, with a detective, Fix, following them the whole way.
- 3team
- 80 daysduration
- Deliveredoutcome
- 7handoffs, our count
- 5re-plans, our count
Start your free trial7 days, every feature, on your Google or Microsoft account.
Around the World in Eighty Days as a Kanban board
The board is frozen at one moment, in New York, 11 December 1872, after the liner has gone. 1 cards wait in To do, 2 are in progress, 1 is blocked and 5 are done. The card on the critical path is "Cross the Atlantic", owned by Fogg. Blocked: "Liner to Liverpool", which the team cannot move on its own.
To do
- Reach the Reform Club
In progress
- Cross the Atlantic
- Buy a ship if needed
Blocked
- Liner to Liverpool
Done
- London to Suez
- Suez to Bombay
- Bombay to Calcutta
- Calcutta to Hong Kong
- Yokohama to San Francisco
Purple label: on the critical path. Letter: the card owner, and a question mark means nobody owns it. Blocked: stopped by something outside the team.
Around the World in Eighty Days: the timeline as a Gantt chart
The same work on a timeline: 9 cards, 8 dependencies and the today line at Day 70. 1 card is a milestone, drawn as a diamond. No arrow is red: every card waits for the one before it, as planned.
Dates follow the timeline stated in the book.
| Card | Start | Due |
|---|---|---|
| London to Suez | Day 0 | Day 7 |
| Suez to Bombay | Day 7 | Day 20 |
| Bombay to Calcutta | Day 20 | Day 23 |
| Calcutta to Hong Kong | Day 23 | Day 36 |
| Hong Kong to Yokohama | Day 36 | Day 42 |
| Yokohama to San Francisco | Day 42 | Day 64 |
| San Francisco to New York | Day 64 | Day 71 |
| New York to London | Day 71 | Day 80 |
| Back at the club | Day 80 | Milestone |
What happened, in project terms
Fogg published his schedule leg by leg, then lost time to a missing railway, a missed steamer and a train attack. He spent money to recover every slip, and the buffer he did not know he had, a day gained by travelling east, saved the bet.
By our count the quest has 7 handoffs, moments where work changes hands, and 5 re-plans: more re-plans than most books on this page.
Lessons for project managers
A fixed deadline needs a buffer, and a plan B for every leg
In Kanbanchi, give every leg of the route its own card with a start and due date, then link the legs with dependencies. When one slips, the Gantt chart shows at once which later legs move with it.
Track money as well as time
Fogg recovered every slip by spending, and by the end most of his travel money was gone. A schedule without a budget line hides the real cost of keeping it.
Check the calendar you are measuring against
Fogg thought he had lost by a day. Travelling east, he had gained one, and his servant noticed in time. Agree what counts as a day, and who keeps the official date.
What went wrong: the risk register
Most of what went wrong was visible early. Here are three risks a project manager could have written down at the start. Switch between the plan and what actually happened.
A leg of the published route does not exist
Mitigation: Check every leg against a current source before leaving, and carry cash for workarounds.
What happened: The railway across India stopped at Kholby, fifty miles short. Fogg bought an elephant and kept to the schedule. Absorbed
A team member is compromised by an outsider
Mitigation: Keep the team briefed so nobody can be talked into a mistake, and know the backup connections.
What happened: Fix got Passepartout drunk in Hong Kong, so the steamer to Yokohama left without Fogg. Fogg hired a pilot boat and caught up. Absorbed
The last connection is missed
Mitigation: Know the alternatives for the final leg and what they cost.
What happened: The liner from New York had sailed. Fogg chartered a cargo steamer, bought it at sea and burned its woodwork to keep going. Absorbed
Around the World in Eighty Days by the numbers
| Book | Around the World in Eighty Days |
|---|---|
| Author | Jules Verne |
| First published | 1872 |
| Setting | Around the world, 1872 |
| Quest type | Journey |
| Team | Fogg, Passepartout, later Aouda |
| Duration | 80 days |
| Outcome | Delivered |
| Handoffs (our count) | 7 |
| Re-plans (our count) | 5 |
| Dates on this page | As stated in the book |
Questions about Around the World in Eighty Days as a project
What does Around the World in Eighty Days teach about project management?
A fixed deadline needs a buffer, and a plan B for every leg. Track money as well as time, and check the calendar you are measuring against. The full reasoning is in the lessons above.
How long does the quest in Around the World in Eighty Days take?
80 days. The Gantt chart on this page follows the timeline stated in the book.
How would you set up Around the World in Eighty Days as a Kanban board?
Four lists: To do, In progress, Blocked and Done. At the moment shown above there are 1 cards to do, 2 in progress, 1 blocked and 5 done. The card to watch is "Cross the Atlantic", on the critical path. Give it two owners, and link it to the cards it waits on so the Gantt chart shows the order.
Plan your own quest on one board and one timeline
Lists for the work, two names on every critical card and the dependencies drawn before anything goes wrong, inside the Google or Microsoft account you already use.
Start your free trialBoard and Gantt chart on the same cards. Plan your own quest.