The Great Train Robbery as a project: Kanban board and Gantt chart
In London in 1855, Edward Pierce plans to steal the gold sent by train to pay British troops in the Crimea. The gold travels in safes that need four keys, held in different places, and every key has to be copied before the train can be robbed.
- A small crew led by Edward Pierceteam
- About a year of preparationduration (approximate)
- Delivered at a costoutcome
- 4handoffs, our count
- 3re-plans, our count
Start your free trial7 days, every feature, on your Google or Microsoft account.
The Great Train Robbery as a Kanban board
The board is frozen at one moment, with the last keys still to copy. 1 cards wait in To do, 2 are in progress, 1 is blocked and 3 are done. The card on the critical path is "Copy the railway office keys", owned by Pierce. Blocked: "Get past the office watchman", which the team cannot move on its own.
To do
- Rob the gold train
In progress
- Copy the railway office keys
- Plan the ride in the luggage van
Blocked
- Get past the office watchman
Done
- Learn the gold schedule
- Copy the banker's key
- Copy the manager's key
Purple label: on the critical path. Letter: the card owner, and a question mark means nobody owns it. Blocked: stopped by something outside the team.
The Great Train Robbery: the timeline as a Gantt chart
The same work on a timeline: 6 cards, 7 dependencies and the today line at Month 9. 2 cards are milestones, drawn as diamonds. No arrow is red: every card waits for the one before it, as planned.
Dates are approximate: the book does not give a full timeline, so the chart uses relative steps.
| Card | Start | Due |
|---|---|---|
| Learn the gold schedule | Month 0 | Month 2 |
| Key: the banker | Month 2 | Month 5 |
| Key: the manager | Month 3 | Month 6 |
| Keys: the railway office | Month 5 | Month 10 |
| All keys copied | Month 10 | Milestone |
| Rob the train | Month 11 | Milestone |
What happened, in project terms
The gold travelled in safes that needed four keys, kept in different places by people who never let them out of sight. Each key was its own small project, with its own wax impression and its own risk, and the train could only be robbed once all of them were done. That is a Gantt chart with several bars converging on one milestone.
By our count the quest has 4 handoffs, moments where work changes hands, and 3 re-plans: about as many re-plans as the typical book on this page.
Lessons for project managers
Parallel workstreams, one deadline: map every dependency
In Kanbanchi, put each preparation stream in its own swimlane and link all of them to one milestone card for the day itself. The milestone cannot go green until every arrow into it is done.
Track converging work with one milestone
Four separate streams had to finish before one fixed date. Link each one to a single milestone, so you can see which stream is holding up the day.
Plan for after the deadline too
Most plans stop at launch. The risks that caught the gang came later, so plan the support period as part of the project.
What went wrong: the risk register
Most of what went wrong was visible early. Here are three risks a project manager could have written down at the start. Switch between the plan and what actually happened.
Four keys, four points of failure
Mitigation: Treat each key as its own workstream with an owner and a deadline.
What happened: All four keys were copied, but each took its own plan, and the last ones were the hardest to reach. Mitigated
The job can be done only once, with no rehearsal
Mitigation: Rehearse every step you can separately, and agree what to do if one fails.
What happened: The robbery on the moving train went through. Mitigated
The plan ends at the deadline, not after it
Mitigation: Plan what happens after the job, including what people will say.
What happened: The robbery worked, but members of the gang were later caught, and Pierce stood trial before escaping from court. Materialised
The Great Train Robbery by the numbers
| Book | The Great Train Robbery |
|---|---|
| Author | Michael Crichton |
| First published | 1975 |
| Setting | London, 1855 |
| Quest type | Heist |
| Team | A small crew led by Edward Pierce |
| Duration | About a year of preparation |
| Outcome | Delivered at a cost |
| Handoffs (our count) | 4 |
| Re-plans (our count) | 3 |
| Dates on this page | Approximate: the book gives no full timeline, so the Gantt chart uses relative steps |
Questions about The Great Train Robbery as a project
What does The Great Train Robbery teach about project management?
Parallel workstreams, one deadline: map every dependency. Track converging work with one milestone, and plan for after the deadline too. The full reasoning is in the lessons above.
How long does the quest in The Great Train Robbery take?
About a year of preparation. The book gives no full timeline, so the Gantt chart on this page uses approximate, relative steps.
How would you set up The Great Train Robbery as a Kanban board?
Four lists: To do, In progress, Blocked and Done. At the moment shown above there are 1 cards to do, 2 in progress, 1 blocked and 3 done. The card to watch is "Copy the railway office keys", on the critical path. Give it two owners, and link it to the cards it waits on so the Gantt chart shows the order.
Plan your own quest on one board and one timeline
Lists for the work, two names on every critical card and the dependencies drawn before anything goes wrong, inside the Google or Microsoft account you already use.
Start your free trialBoard and Gantt chart on the same cards. Plan your own quest.