Jurassic Park as a project: Kanban board and Gantt chart
John Hammond has built a park of cloned dinosaurs on Isla Nublar and needs it signed off before opening. Over one weekend his investors' lawyer and three outside experts tour the park, with Hammond's grandchildren along.
- Park staff and an inspection teamteam
- About two daysduration (approximate)
- Not deliveredoutcome
- 3handoffs, our count
- 2re-plans, our count
Start your free trial7 days, every feature, on your Google or Microsoft account.
Jurassic Park as a Kanban board
The board is frozen at one moment, as the fences go down. 2 cards wait in To do, 2 are in progress, 1 is blocked and 3 are done. The card on the critical path is "Restore the power", owned by Arnold. Blocked: "Security systems", which the team cannot move on its own.
To do
- Open to the public
- Pass the inspection
In progress
- Restore the power
- Find the children
Blocked
- Security systems
Done
- Build the park
- Invite the inspectors
- Hand all systems to one contractor
Purple label: on the critical path. Letter: the card owner, and a question mark means nobody owns it. Blocked: stopped by something outside the team.
Jurassic Park: the timeline as a Gantt chart
The same work on a timeline: 7 cards, 4 dependencies and the today line at Hour 20. 3 cards are milestones, drawn as diamonds. No arrow is red: every card waits for the one before it, as planned.
Dates are approximate: the book does not give a full timeline, so the chart uses relative steps.
| Card | Start | Due |
|---|---|---|
| Inspectors arrive | Hour 0 | Milestone |
| Tour of the park | Hour 2 | Hour 12 |
| Security off | Hour 14 | Milestone |
| Storm | Hour 12 | Hour 20 |
| Restore the power | Hour 16 | Hour 30 |
| Find the children | Hour 15 | Hour 40 |
| Leave the island | Hour 44 | Milestone |
What happened, in project terms
The park's systems were run by one programmer who felt underpaid and had access to everything. When he switched off security to smuggle embryos to a rival, a storm and the animals did the rest. That is a single point of failure with a grievance, and it was on the org chart long before the inspection weekend.
By our count the quest has 3 handoffs, moments where work changes hands, and 2 re-plans: fewer re-plans than most books on this page.
Lessons for project managers
Never let one unhappy contractor hold all the keys
In Kanbanchi, add the acceptance check as its own card at the end of the build, with an owner who did not build the thing. A card in Done should mean someone else has looked at it.
Test that your monitoring can see the unexpected
A dashboard that shows only expected values reports success all the way to failure. Ask what it would show if things went wrong.
Keep a manual fallback for critical systems
When the power went down, restoring it meant walking to a shed in the park. Make sure the recovery path does not cross the hazard.
What went wrong: the risk register
Most of what went wrong was visible early. Here are three risks a project manager could have written down at the start. Switch between the plan and what actually happened.
One contractor holds all the keys
Mitigation: Split access to critical systems, and review who can switch off security.
What happened: Dennis Nedry, the underpaid programmer who ran the systems, turned off security to smuggle out embryos, and the fences went down in a storm. Materialised
The monitoring sees only what it expects
Mitigation: Test that monitoring can report what it was not designed to look for.
What happened: The computer counted animals only up to the expected total. When the team raised the limit, it found the dinosaurs were breeding. Materialised
The opening date comes before the systems are proven
Mitigation: Run the inspection and the fixes before setting a date.
What happened: The inspection weekend was the first full test, and it was run with guests and children on site. Materialised
Jurassic Park by the numbers
| Book | Jurassic Park |
|---|---|
| Author | Michael Crichton |
| First published | 1990 |
| Setting | Isla Nublar |
| Quest type | Build |
| Team | Park staff and an inspection team |
| Duration | About two days |
| Outcome | Not delivered |
| Handoffs (our count) | 3 |
| Re-plans (our count) | 2 |
| Dates on this page | Approximate: the book gives no full timeline, so the Gantt chart uses relative steps |
Questions about Jurassic Park as a project
What does Jurassic Park teach about project management?
Never let one unhappy contractor hold all the keys. Test that your monitoring can see the unexpected, and keep a manual fallback for critical systems. The full reasoning is in the lessons above.
How long does the quest in Jurassic Park take?
About two days. The book gives no full timeline, so the Gantt chart on this page uses approximate, relative steps.
How would you set up Jurassic Park as a Kanban board?
Four lists: To do, In progress, Blocked and Done. At the moment shown above there are 2 cards to do, 2 in progress, 1 blocked and 3 done. The card to watch is "Restore the power", on the critical path. Give it two owners, and link it to the cards it waits on so the Gantt chart shows the order.
Plan your own quest on one board and one timeline