Jurassic Park as a project

BuildBook by Michael Crichton, 1990 Isla Nublar

Jurassic Park as a project: Kanban board and Gantt chart

John Hammond has built a park of cloned dinosaurs on Isla Nublar and needs it signed off before opening. Over one weekend his investors' lawyer and three outside experts tour the park, with Hammond's grandchildren along.

  • Park staff and an inspection teamteam
  • About two daysduration (approximate)
  • Not deliveredoutcome
  • 3handoffs, our count
  • 2re-plans, our count

Start your free trial7 days, every feature, on your Google or Microsoft account.

Jurassic Park as a Kanban board

The board is frozen at one moment, as the fences go down. 2 cards wait in To do, 2 are in progress, 1 is blocked and 3 are done. The card on the critical path is "Restore the power", owned by Arnold. Blocked: "Security systems", which the team cannot move on its own.

To do

  • Open to the public
  • Pass the inspection

In progress

  • Restore the power
  • Find the children

Blocked

  • Security systems

Done

  • Build the park
  • Invite the inspectors
  • Hand all systems to one contractor

Purple label: on the critical path. Letter: the card owner, and a question mark means nobody owns it. Blocked: stopped by something outside the team.

Run your own project on a board like this

Lists, owners, due dates and subcards, inside the Google Drive or Microsoft account your team already uses.

Start your free trial

Jurassic Park: the timeline as a Gantt chart

The same work on a timeline: 7 cards, 4 dependencies and the today line at Hour 20. 3 cards are milestones, drawn as diamonds. No arrow is red: every card waits for the one before it, as planned.

Dates are approximate: the book does not give a full timeline, so the chart uses relative steps.

Cards on the timeline
CardStartDue
Inspectors arriveHour 0Milestone
Tour of the parkHour 2Hour 12
Security offHour 14Milestone
StormHour 12Hour 20
Restore the powerHour 16Hour 30
Find the childrenHour 15Hour 40
Leave the islandHour 44Milestone

What happened, in project terms

The park's systems were run by one programmer who felt underpaid and had access to everything. When he switched off security to smuggle embryos to a rival, a storm and the animals did the rest. That is a single point of failure with a grievance, and it was on the org chart long before the inspection weekend.

By our count the quest has 3 handoffs, moments where work changes hands, and 2 re-plans: fewer re-plans than most books on this page.

Lessons for project managers

  1. Never let one unhappy contractor hold all the keys

    In Kanbanchi, add the acceptance check as its own card at the end of the build, with an owner who did not build the thing. A card in Done should mean someone else has looked at it.

  2. Test that your monitoring can see the unexpected

    A dashboard that shows only expected values reports success all the way to failure. Ask what it would show if things went wrong.

  3. Keep a manual fallback for critical systems

    When the power went down, restoring it meant walking to a shed in the park. Make sure the recovery path does not cross the hazard.

Draw the dependencies before they bite

The Gantt chart uses the same cards your team already moves on the board.

Start your free trial

What went wrong: the risk register

Most of what went wrong was visible early. Here are three risks a project manager could have written down at the start. Switch between the plan and what actually happened.

  • One contractor holds all the keys

    Likelihood: highImpact: severe

    Mitigation: Split access to critical systems, and review who can switch off security.

    What happened: Dennis Nedry, the underpaid programmer who ran the systems, turned off security to smuggle out embryos, and the fences went down in a storm. Materialised

  • The monitoring sees only what it expects

    Likelihood: mediumImpact: severe

    Mitigation: Test that monitoring can report what it was not designed to look for.

    What happened: The computer counted animals only up to the expected total. When the team raised the limit, it found the dinosaurs were breeding. Materialised

  • The opening date comes before the systems are proven

    Likelihood: highImpact: high

    Mitigation: Run the inspection and the fixes before setting a date.

    What happened: The inspection weekend was the first full test, and it was run with guests and children on site. Materialised

Jurassic Park by the numbers

BookJurassic Park
AuthorMichael Crichton
First published1990
SettingIsla Nublar
Quest typeBuild
TeamPark staff and an inspection team
DurationAbout two days
OutcomeNot delivered
Handoffs (our count)3
Re-plans (our count)2
Dates on this pageApproximate: the book gives no full timeline, so the Gantt chart uses relative steps

Questions about Jurassic Park as a project

What does Jurassic Park teach about project management?

Never let one unhappy contractor hold all the keys. Test that your monitoring can see the unexpected, and keep a manual fallback for critical systems. The full reasoning is in the lessons above.

How long does the quest in Jurassic Park take?

About two days. The book gives no full timeline, so the Gantt chart on this page uses approximate, relative steps.

How would you set up Jurassic Park as a Kanban board?

Four lists: To do, In progress, Blocked and Done. At the moment shown above there are 2 cards to do, 2 in progress, 1 blocked and 3 done. The card to watch is "Restore the power", on the critical path. Give it two owners, and link it to the cards it waits on so the Gantt chart shows the order.

Plan your own quest on one board and one timeline

Lists for the work, two names on every critical card and the dependencies drawn before anything goes wrong, inside the Google or Microsoft account you already use.