Life of Pi as a project: Kanban board and Gantt chart
When the ship carrying his family's zoo sinks in the Pacific, Pi is left in a lifeboat with a Bengal tiger, Richard Parker. He survives 227 days at sea before reaching Mexico.
- 2team
- 227 daysduration
- Delivered at a costoutcome
- 1handoffs, our count
- 3re-plans, our count
Start your free trial7 days, every feature, on your Google or Microsoft account.
Life of Pi as a Kanban board
The board is frozen at one moment, in the first weeks on the lifeboat. 1 cards wait in To do, 2 are in progress, 1 is blocked and 3 are done. The card on the critical path is "Keep the tiger fed and watered", owned by Pi. Blocked: "Get picked up by a passing ship", which the team cannot move on its own.
To do
- Reach land
In progress
- Keep the tiger fed and watered
- Fish from the raft
Blocked
- Get picked up by a passing ship
Done
- Survive the sinking
- Rig a raft
- Mark out a territory
Purple label: on the critical path. Letter: the card owner, and a question mark means nobody owns it. Blocked: stopped by something outside the team.
Life of Pi: the timeline as a Gantt chart
The same work on a timeline: 5 cards, 4 dependencies and the today line at Day 40. 2 cards are milestones, drawn as diamonds. No arrow is red: every card waits for the one before it, as planned.
Dates follow the timeline stated in the book.
| Card | Start | Due |
|---|---|---|
| Ship sinks | Day 0 | Milestone |
| Rig the raft | Day 1 | Day 6 |
| Train the tiger | Day 6 | Day 60 |
| Fish, ration, collect water | Day 6 | Day 227 |
| Reach Mexico | Day 227 | Milestone |
What happened, in project terms
After the ship sank, Pi shared a lifeboat with a Bengal tiger called Richard Parker. He survived by rigging a raft of his own, marking out territory, training the tiger and keeping it fed and watered on a fixed routine. It is the most extreme stakeholder management in fiction, and the principles hold: clear boundaries, steady supply, no surprises.
By our count the quest has 1 handoff, moments where work changes hands, and 3 re-plans: about as many re-plans as the typical book on this page.
Lessons for project managers
A risky stakeholder needs routines, boundaries and regular feeding
In Kanbanchi, keep a short Blocked list and review it every day. Survival plans fail when a blocker sits unnoticed, not when the team lacks ideas.
Use the manual
The lifeboat had a survival manual, and Pi used it. Most problems have been met before, so read what is written down.
A temporary fix can look like a permanent one
The island gave food and rest, and would have killed him if he had stayed. Review a workaround before it becomes the plan.
What went wrong: the risk register
Most of what went wrong was visible early. Here are three risks a project manager could have written down at the start. Switch between the plan and what actually happened.
The biggest stakeholder can end the project at any time
Mitigation: Set clear boundaries, a routine and a steady supply.
What happened: Pi rigged a raft, marked out territory and trained the tiger. Richard Parker never attacked him. Mitigated
Supplies run out
Mitigation: Ration, then build ways to collect more.
What happened: He used the survival kit, fished, rationed and collected rainwater and fresh water from the stills. Absorbed
A refuge that looks safe is not
Mitigation: Check a refuge over time before you settle there.
What happened: The floating island of algae turned out to be deadly at night. Pi worked it out and left. Absorbed
Life of Pi by the numbers
| Book | Life of Pi |
|---|---|
| Author | Yann Martel |
| First published | 2001 |
| Setting | The Pacific, 1977 |
| Quest type | Survival |
| Team | A boy and a Bengal tiger |
| Duration | 227 days |
| Outcome | Delivered at a cost |
| Handoffs (our count) | 1 |
| Re-plans (our count) | 3 |
| Dates on this page | As stated in the book |
Questions about Life of Pi as a project
What does Life of Pi teach about project management?
A risky stakeholder needs routines, boundaries and regular feeding. Use the manual, and a temporary fix can look like a permanent one. The full reasoning is in the lessons above.
How long does the quest in Life of Pi take?
227 days. The Gantt chart on this page follows the timeline stated in the book.
How would you set up Life of Pi as a Kanban board?
Four lists: To do, In progress, Blocked and Done. At the moment shown above there are 1 cards to do, 2 in progress, 1 blocked and 3 done. The card to watch is "Keep the tiger fed and watered", on the critical path. Give it two owners, and link it to the cards it waits on so the Gantt chart shows the order.
Plan your own quest on one board and one timeline
Lists for the work, two names on every critical card and the dependencies drawn before anything goes wrong, inside the Google or Microsoft account you already use.
Start your free trialBoard and Gantt chart on the same cards. Plan your own quest.