The Pillars of the Earth as a project

BuildBook by Ken Follett, 1989 Kingsbridge, 12th century

The Pillars of the Earth as a project: Kanban board and Gantt chart

In twelfth-century England, Prior Philip of Kingsbridge and the builder Tom set out to raise a new cathedral after the old one burns. The town is poor, England is at civil war, and the work will take longer than Tom's lifetime.

  • A prior, a master builder and a townteam
  • Decadesduration (approximate)
  • Deliveredoutcome
  • 4handoffs, our count
  • 5re-plans, our count

Start your free trial7 days, every feature, on your Google or Microsoft account.

The Pillars of the Earth as a Kanban board

The board is frozen at one moment, after Tom's death. 2 cards wait in To do, 2 are in progress, 1 is blocked and 3 are done. The card on the critical path is "Lead the build", owned by Jack. Blocked: "Stone from the quarry", which the team cannot move on its own.

To do

  • Raise the new vault
  • Finish the towers

In progress

  • Lead the build
  • Raise money for the works

Blocked

  • Stone from the quarry

Done

  • Clear the burned cathedral
  • Lay the foundations
  • Build the east end

Purple label: on the critical path. Letter: the card owner, and a question mark means nobody owns it. Blocked: stopped by something outside the team.

Run your own project on a board like this

Lists, owners, due dates and subcards, inside the Google Drive or Microsoft account your team already uses.

Start your free trial

The Pillars of the Earth: the timeline as a Gantt chart

The same work on a timeline: 8 cards, 6 dependencies and the today line at Year 14. 3 cards are milestones, drawn as diamonds. No arrow is red: every card waits for the one before it, as planned.

Dates are approximate: the book does not give a full timeline, so the chart uses relative steps.

Cards on the timeline
CardStartDue
Old cathedral burnsYear 0Milestone
Clear the siteYear 0Year 2
FoundationsYear 2Year 5
East endYear 5Year 11
Tom dies, Jack takes overYear 8Milestone
Nave and new vaultYear 11Year 30
TowersYear 30Year 36
Cathedral completeYear 36Milestone

What happened, in project terms

Prior Philip and the builder Tom set out to raise a cathedral in a poor town during a civil war. Money ran short, the works were attacked and burned, and Tom died long before the roof went on. The project survived because his stepson Jack had learned the work and came back with better ways to build. Long projects need succession, and room for new methods.

By our count the quest has 4 handoffs, moments where work changes hands, and 5 re-plans: more re-plans than most books on this page.

Lessons for project managers

  1. Plan for a project that will outlast its first lead

    In Kanbanchi, add the acceptance check as its own card at the end of the build, with an owner who did not build the thing. A card in Done should mean someone else has looked at it.

  2. Fund the project with something that grows

    A fixed grant runs out. Philip turned the project into a reason for the town to grow, and the town paid for the cathedral.

  3. Let the new lead change the method

    Jack built differently from Tom, with taller walls and more light. Succession is a chance to improve the plan, not only to keep it alive.

Draw the dependencies before they bite

The Gantt chart uses the same cards your team already moves on the board.

Start your free trial

What went wrong: the risk register

Most of what went wrong was visible early. Here are three risks a project manager could have written down at the start. Switch between the plan and what actually happened.

  • The lead builder dies before the work is done

    Likelihood: mediumImpact: severe

    Mitigation: Train a successor who knows the plan and the site.

    What happened: Tom was killed. His stepson Jack, who had learned the work on the site, came back and took over with new methods. Absorbed

  • Funding depends on a poor town

    Likelihood: highImpact: high

    Mitigation: Build income that grows with the project.

    What happened: Philip grew the town with a market and a fair, and their income paid for the works. Absorbed

  • A hostile neighbour attacks the site

    Likelihood: highImpact: severe

    Mitigation: Defend the site and keep a plan to recover from losses.

    What happened: William Hamleigh's men attacked Kingsbridge and burned the town during the fair. The project survived and kept building. Materialised

The Pillars of the Earth by the numbers

BookThe Pillars of the Earth
AuthorKen Follett
First published1989
SettingKingsbridge, 12th century
Quest typeBuild
TeamA prior, a master builder and a town
DurationDecades
OutcomeDelivered
Handoffs (our count)4
Re-plans (our count)5
Dates on this pageApproximate: the book gives no full timeline, so the Gantt chart uses relative steps

Questions about The Pillars of the Earth as a project

What does The Pillars of the Earth teach about project management?

Plan for a project that will outlast its first lead. Fund the project with something that grows, and let the new lead change the method. The full reasoning is in the lessons above.

How long does the quest in The Pillars of the Earth take?

Decades. The book gives no full timeline, so the Gantt chart on this page uses approximate, relative steps.

How would you set up The Pillars of the Earth as a Kanban board?

Four lists: To do, In progress, Blocked and Done. At the moment shown above there are 2 cards to do, 2 in progress, 1 blocked and 3 done. The card to watch is "Lead the build", on the critical path. Give it two owners, and link it to the cards it waits on so the Gantt chart shows the order.

Plan your own quest on one board and one timeline

Lists for the work, two names on every critical card and the dependencies drawn before anything goes wrong, inside the Google or Microsoft account you already use.