The Pillars of the Earth as a project: Kanban board and Gantt chart
In twelfth-century England, Prior Philip of Kingsbridge and the builder Tom set out to raise a new cathedral after the old one burns. The town is poor, England is at civil war, and the work will take longer than Tom's lifetime.
- A prior, a master builder and a townteam
- Decadesduration (approximate)
- Deliveredoutcome
- 4handoffs, our count
- 5re-plans, our count
Start your free trial7 days, every feature, on your Google or Microsoft account.
The Pillars of the Earth as a Kanban board
The board is frozen at one moment, after Tom's death. 2 cards wait in To do, 2 are in progress, 1 is blocked and 3 are done. The card on the critical path is "Lead the build", owned by Jack. Blocked: "Stone from the quarry", which the team cannot move on its own.
To do
- Raise the new vault
- Finish the towers
In progress
- Lead the build
- Raise money for the works
Blocked
- Stone from the quarry
Done
- Clear the burned cathedral
- Lay the foundations
- Build the east end
Purple label: on the critical path. Letter: the card owner, and a question mark means nobody owns it. Blocked: stopped by something outside the team.
The Pillars of the Earth: the timeline as a Gantt chart
The same work on a timeline: 8 cards, 6 dependencies and the today line at Year 14. 3 cards are milestones, drawn as diamonds. No arrow is red: every card waits for the one before it, as planned.
Dates are approximate: the book does not give a full timeline, so the chart uses relative steps.
| Card | Start | Due |
|---|---|---|
| Old cathedral burns | Year 0 | Milestone |
| Clear the site | Year 0 | Year 2 |
| Foundations | Year 2 | Year 5 |
| East end | Year 5 | Year 11 |
| Tom dies, Jack takes over | Year 8 | Milestone |
| Nave and new vault | Year 11 | Year 30 |
| Towers | Year 30 | Year 36 |
| Cathedral complete | Year 36 | Milestone |
What happened, in project terms
Prior Philip and the builder Tom set out to raise a cathedral in a poor town during a civil war. Money ran short, the works were attacked and burned, and Tom died long before the roof went on. The project survived because his stepson Jack had learned the work and came back with better ways to build. Long projects need succession, and room for new methods.
By our count the quest has 4 handoffs, moments where work changes hands, and 5 re-plans: more re-plans than most books on this page.
Lessons for project managers
Plan for a project that will outlast its first lead
In Kanbanchi, add the acceptance check as its own card at the end of the build, with an owner who did not build the thing. A card in Done should mean someone else has looked at it.
Fund the project with something that grows
A fixed grant runs out. Philip turned the project into a reason for the town to grow, and the town paid for the cathedral.
Let the new lead change the method
Jack built differently from Tom, with taller walls and more light. Succession is a chance to improve the plan, not only to keep it alive.
What went wrong: the risk register
Most of what went wrong was visible early. Here are three risks a project manager could have written down at the start. Switch between the plan and what actually happened.
The lead builder dies before the work is done
Mitigation: Train a successor who knows the plan and the site.
What happened: Tom was killed. His stepson Jack, who had learned the work on the site, came back and took over with new methods. Absorbed
Funding depends on a poor town
Mitigation: Build income that grows with the project.
What happened: Philip grew the town with a market and a fair, and their income paid for the works. Absorbed
A hostile neighbour attacks the site
Mitigation: Defend the site and keep a plan to recover from losses.
What happened: William Hamleigh's men attacked Kingsbridge and burned the town during the fair. The project survived and kept building. Materialised
The Pillars of the Earth by the numbers
| Book | The Pillars of the Earth |
|---|---|
| Author | Ken Follett |
| First published | 1989 |
| Setting | Kingsbridge, 12th century |
| Quest type | Build |
| Team | A prior, a master builder and a town |
| Duration | Decades |
| Outcome | Delivered |
| Handoffs (our count) | 4 |
| Re-plans (our count) | 5 |
| Dates on this page | Approximate: the book gives no full timeline, so the Gantt chart uses relative steps |
Questions about The Pillars of the Earth as a project
What does The Pillars of the Earth teach about project management?
Plan for a project that will outlast its first lead. Fund the project with something that grows, and let the new lead change the method. The full reasoning is in the lessons above.
How long does the quest in The Pillars of the Earth take?
Decades. The book gives no full timeline, so the Gantt chart on this page uses approximate, relative steps.
How would you set up The Pillars of the Earth as a Kanban board?
Four lists: To do, In progress, Blocked and Done. At the moment shown above there are 2 cards to do, 2 in progress, 1 blocked and 3 done. The card to watch is "Lead the build", on the critical path. Give it two owners, and link it to the cards it waits on so the Gantt chart shows the order.
Plan your own quest on one board and one timeline
Lists for the work, two names on every critical card and the dependencies drawn before anything goes wrong, inside the Google or Microsoft account you already use.
Start your free trialBoard and Gantt chart on the same cards. Plan your own quest.