Robinson Crusoe as a project: Kanban board and Gantt chart
Shipwrecked alone on an island in 1659, Robinson Crusoe salvages what he can from the wreck and builds a life there. He stays 28 years, the last few of them with Friday, before an English ship takes them off.
- 1team
- 28 years on the islandduration
- Deliveredoutcome
- 1handoffs, our count
- 4re-plans, our count
Start your free trial7 days, every feature, on your Google or Microsoft account.
Robinson Crusoe as a Kanban board
The board is frozen at one moment, the day the big canoe will not move. 1 cards wait in To do, 1 is in progress, 1 is blocked and 4 are done. The card on the critical path is "Get the canoe to the water", and nobody owns it. Blocked: "Get the canoe to the water", which the team cannot move on its own.
To do
- Get off the island
In progress
- Grow barley and rice
Blocked
- Get the canoe to the water
Done
- Salvage the wreck
- Build the shelter
- Fence it in
- Keep a calendar
Purple label: on the critical path. Letter: the card owner, and a question mark means nobody owns it. Blocked: stopped by something outside the team.
Robinson Crusoe: the timeline as a Gantt chart
The same work on a timeline: 7 cards, 4 dependencies and the today line at Year 5.5. 3 cards are milestones, drawn as diamonds. No arrow is red: every card waits for the one before it, as planned.
Dates follow the timeline stated in the book.
| Card | Start | Due |
|---|---|---|
| Shipwreck | Year 0 | Milestone |
| Build the shelter | Year 0 | Year 1 |
| First crops | Year 1 | Year 3 |
| Carve the big canoe | Year 4 | Year 5 |
| A smaller boat | Year 6 | Year 8 |
| Friday arrives | Year 25 | Milestone |
| Rescued | Year 28 | Milestone |
What happened, in project terms
Crusoe spent months carving a huge canoe out of a single tree, then found he could not move it the hundred yards or so to the water. It stayed where it was. The rest of his years on the island were a lesson in small, testable builds: a shelter, a fence, a crop, a smaller boat. Ask how the thing will reach its users before you start making it.
By our count the quest has 1 handoff, moments where work changes hands, and 4 re-plans: more re-plans than most books on this page.
Lessons for project managers
Check the deployment path before you build
In Kanbanchi, add the acceptance check as its own card at the end of the build, with an owner who did not build the thing. A card in Done should mean someone else has looked at it.
Keep a log
Crusoe kept a calendar post and a journal. A record of what happened, and when, is how a long project learns from its own mistakes.
Pilot before you scale
He sowed part of his seed and kept the rest back. Small, testable steps beat one big build that only works if everything goes right.
What went wrong: the risk register
Most of what went wrong was visible early. Here are three risks a project manager could have written down at the start. Switch between the plan and what actually happened.
The thing you built cannot be deployed
Mitigation: Check how the result will reach the water before you start carving.
What happened: Crusoe spent months on a huge canoe and could not move it to the sea. It stayed where it was. Materialised
The main supply source is about to disappear
Mitigation: Use the window while it lasts, and prioritise what you take.
What happened: He made trip after trip to the wreck and brought off tools, food and powder before it broke up. Mitigated
The first crop is planted at the wrong time
Mitigation: Learn the local seasons and test with part of the seed.
What happened: His first sowing failed because he did not yet know the seasons. He kept some seed back, learned the seasons and did better after that. Absorbed
Robinson Crusoe by the numbers
| Book | Robinson Crusoe |
|---|---|
| Author | Daniel Defoe |
| First published | 1719 |
| Setting | Crusoe's island, 1659 to 1686 |
| Quest type | Build |
| Team | 1, later 2 with Friday |
| Duration | 28 years on the island |
| Outcome | Delivered |
| Handoffs (our count) | 1 |
| Re-plans (our count) | 4 |
| Dates on this page | As stated in the book |
Questions about Robinson Crusoe as a project
What does Robinson Crusoe teach about project management?
Check the deployment path before you build. Keep a log, and pilot before you scale. The full reasoning is in the lessons above.
How long does the quest in Robinson Crusoe take?
28 years on the island. The Gantt chart on this page follows the timeline stated in the book.
How would you set up Robinson Crusoe as a Kanban board?
Four lists: To do, In progress, Blocked and Done. At the moment shown above there are 1 cards to do, 1 in progress, 1 blocked and 4 done. The card to watch is "Get the canoe to the water", on the critical path. Give it two owners, and link it to the cards it waits on so the Gantt chart shows the order.
Plan your own quest on one board and one timeline
Lists for the work, two names on every critical card and the dependencies drawn before anything goes wrong, inside the Google or Microsoft account you already use.
Start your free trialBoard and Gantt chart on the same cards. Plan your own quest.