Watership Down as a project: Kanban board and Gantt chart
Fiver has a vision that the home warren at Sandleford is doomed, and his brother Hazel leads a small group of rabbits away to find a new home. They find it on Watership Down, then realise their new warren has no future without does.
- about 11team
- A spring and summerduration (approximate)
- Deliveredoutcome
- 3handoffs, our count
- 4re-plans, our count
Start your free trial7 days, every feature, on your Google or Microsoft account.
Watership Down as a Kanban board
The board is frozen at one moment, as General Woundwort attacks. 1 cards wait in To do, 2 are in progress, 1 is blocked and 3 are done. The card on the critical path is "Hold the warren", owned by Bigwig. Blocked: "Make peace with Efrafa", which the team cannot move on its own.
To do
- Grow the warren
In progress
- Hold the warren
- Fetch the farm dog
Blocked
- Make peace with Efrafa
Done
- Leave Sandleford
- Find Watership Down
- Bring does from Efrafa
Purple label: on the critical path. Letter: the card owner, and a question mark means nobody owns it. Blocked: stopped by something outside the team.
Watership Down: the timeline as a Gantt chart
The same work on a timeline: 7 cards, 6 dependencies and the today line at Week 13. 1 card is a milestone, drawn as a diamond. No arrow is red: every card waits for the one before it, as planned.
Dates are approximate: the book does not give a full timeline, so the chart uses relative steps.
| Card | Start | Due |
|---|---|---|
| Fiver's warning | Week 0 | Milestone |
| Journey to the down | Week 0 | Week 2 |
| Dig the new warren | Week 2 | Week 4 |
| No does: find a fix | Week 4 | Week 8 |
| Raid on Efrafa | Week 8 | Week 10 |
| Defend the warren | Week 12 | Week 13.5 |
| Peace and growth | Week 14 | Week 16 |
What happened, in project terms
Fiver warned that the home warren was doomed, and only a handful listened; the warren was later destroyed. The escapees found a fine site on Watership Down, then realised they had no does, so the new warren had no future. Fixing that meant a raid on a militarised rival warren, and a siege when its general came after them. Plan phase two before phase one ends.
By our count the quest has 3 handoffs, moments where work changes hands, and 4 re-plans: more re-plans than most books on this page.
Lessons for project managers
Ask early what success needs in order to last
In Kanbanchi, give each threat a card with an owner, a due date for the next check and a Critical path label if it can end the project. Threats without cards are the ones that arrive as surprises.
Recruit outside help
Kehaar could fly, scout and fight. A partner with different skills can make the impossible part of a plan possible.
Plan the defence before you need it
After the raid, General Woundwort came after them. The warren held because Bigwig and Hazel had planned for the attack.
What went wrong: the risk register
Most of what went wrong was visible early. Here are three risks a project manager could have written down at the start. Switch between the plan and what actually happened.
An early warning is ignored
Mitigation: Take early warnings seriously, even when they are hard to prove.
What happened: Only a few rabbits listened to Fiver. The Sandleford warren was later destroyed. Materialised
A welcoming partner has a hidden risk
Mitigation: Ask why the partner is so welcoming before you settle there.
What happened: Cowslip's warren was well fed because it was snared. Bigwig was caught in a snare and freed. Absorbed
A missing capability means no future
Mitigation: Ask early what success needs in order to last.
What happened: They raided the militarised warren of Efrafa for does, with help from the gull Kehaar. Mitigated
Watership Down by the numbers
| Book | Watership Down |
|---|---|
| Author | Richard Adams |
| First published | 1972 |
| Setting | The Berkshire Downs |
| Quest type | Defence |
| Team | About 11 rabbits |
| Duration | A spring and summer |
| Outcome | Delivered |
| Handoffs (our count) | 3 |
| Re-plans (our count) | 4 |
| Dates on this page | Approximate: the book gives no full timeline, so the Gantt chart uses relative steps |
Questions about Watership Down as a project
What does Watership Down teach about project management?
Ask early what success needs in order to last. Recruit outside help, and plan the defence before you need it. The full reasoning is in the lessons above.
How long does the quest in Watership Down take?
A spring and summer. The book gives no full timeline, so the Gantt chart on this page uses approximate, relative steps.
How would you set up Watership Down as a Kanban board?
Four lists: To do, In progress, Blocked and Done. At the moment shown above there are 1 cards to do, 2 in progress, 1 blocked and 3 done. The card to watch is "Hold the warren", on the critical path. Give it two owners, and link it to the cards it waits on so the Gantt chart shows the order.
Plan your own quest on one board and one timeline
Lists for the work, two names on every critical card and the dependencies drawn before anything goes wrong, inside the Google or Microsoft account you already use.
Start your free trialBoard and Gantt chart on the same cards. Plan your own quest.