Frankenstein as a project: Kanban board and Gantt chart

Victor Frankenstein, a student at Ingolstadt, spends close to two years in secret building a creature and bringing it to life. There is no sponsor, no review and no plan for what happens once it works.

  • 1team
  • About two years to buildduration (approximate)
  • Not deliveredoutcome
  • 1handoffs, our count
  • 2re-plans, our count

Start your free trial7 days, every feature, on your Google or Microsoft account.

Frankenstein as a Kanban board

The board is frozen at one moment, the night the creature wakes. 2 cards wait in To do, 1 is in progress, 1 is blocked and 3 are done. The card on the critical path is "Bring it to life", owned by Victor. Blocked: "Get a second opinion", which the team cannot move on its own.

To do

  • Look after what you built
  • Tell anyone at all

In progress

  • Bring it to life

Blocked

  • Get a second opinion

Done

  • Study natural philosophy
  • Collect the materials
  • Assemble the body

Purple label: on the critical path. Letter: the card owner, and a question mark means nobody owns it. Blocked: stopped by something outside the team.

Run your own project on a board like this

Lists, owners, due dates and subcards, inside the Google Drive or Microsoft account your team already uses.

Start your free trial

Frankenstein: the timeline as a Gantt chart

The same work on a timeline: 6 cards, 4 dependencies and the today line at Month 27. 1 card is a milestone, drawn as a diamond. No arrow is red: every card waits for the one before it, as planned.

Dates are approximate: the book does not give a full timeline, so the chart uses relative steps.

Cards on the timeline
CardStartDue
Study at IngolstadtMonth 0Month 10
Collect the materialsMonth 10Month 13
Assemble the bodyMonth 13Month 23
It wakesMonth 23Milestone
Handover and careMonth 23Month 26
The creature on its ownMonth 24Month 30

What happened, in project terms

Victor Frankenstein spent close to two years building his creature in secret, with no review, no sponsor and no plan for what happened once it worked. When it opened its eyes, he fled. Everything that followed came from that missing handover. Decide who looks after the thing you are building before you finish building it.

By our count the quest has 1 handoff, moments where work changes hands, and 2 re-plans: fewer re-plans than most books on this page.

Lessons for project managers

  1. Shipping is not the end: plan the handover and the support

    In Kanbanchi, add the acceptance check as its own card at the end of the build, with an owner who did not build the thing. A card in Done should mean someone else has looked at it.

  2. Tell someone

    Secrecy felt safe and made every problem bigger. Report early, even when the news is embarrassing, so others can help.

  3. Do not restart a cancelled build under pressure

    Victor agreed to build a second creature, then destroyed it half-finished, in front of the first. Decide on a second phase calmly, and keep your word once you do.

Draw the dependencies before they bite

The Gantt chart uses the same cards your team already moves on the board.

Start your free trial

What went wrong: the risk register

Most of what went wrong was visible early. Here are three risks a project manager could have written down at the start. Switch between the plan and what actually happened.

  • Nobody reviews the work

    Likelihood: highImpact: severe

    Mitigation: Show the work to someone qualified before it goes live.

    What happened: Victor worked alone and told no one. Nobody had a chance to question the idea before it was too late. Materialised

  • The builder walks away after launch

    Likelihood: mediumImpact: severe

    Mitigation: Decide who looks after the result before you finish building it.

    What happened: When the creature opened its eyes, Victor fled. It went out into the world alone, and everything that followed came from there. Materialised

  • Silence makes the damage worse

    Likelihood: highImpact: severe

    Mitigation: When something goes wrong, tell the people affected.

    What happened: Victor knew who had killed his brother but said nothing, and Justine was executed for the crime. Materialised

Frankenstein by the numbers

BookFrankenstein
AuthorMary Shelley
First published1818
SettingGeneva and Ingolstadt, 1790s
Quest typeBuild
Team1, working alone
DurationAbout two years to build
OutcomeNot delivered
Handoffs (our count)1
Re-plans (our count)2
Dates on this pageApproximate: the book gives no full timeline, so the Gantt chart uses relative steps

Questions about Frankenstein as a project

What does Frankenstein teach about project management?

Shipping is not the end: plan the handover and the support. Tell someone, and do not restart a cancelled build under pressure. The full reasoning is in the lessons above.

How long does the quest in Frankenstein take?

About two years to build. The book gives no full timeline, so the Gantt chart on this page uses approximate, relative steps.

How would you set up Frankenstein as a Kanban board?

Four lists: To do, In progress, Blocked and Done. At the moment shown above there are 2 cards to do, 1 in progress, 1 blocked and 3 done. The card to watch is "Bring it to life", on the critical path. Give it two owners, and link it to the cards it waits on so the Gantt chart shows the order.

Plan your own quest on one board and one timeline

Lists for the work, two names on every critical card and the dependencies drawn before anything goes wrong, inside the Google or Microsoft account you already use.